Flexibility need prompts installation of Zeepipe modeling system
Journal Article
·
· Oil and Gas Journal
OSTI ID:586084
- Statoil, Stavanger (Norway)
Installation by den norske stats oljeselskap A.S. (Statoil) of a powerful pipeline-modeling system on Zeepipe has allowed this major North Sea gas pipeline to meet the growing demands and seasonal variations of the European gas market. The Troll gas-sales agreement (TGSA) in 1986 called for large volumes of Norwegian gas to begin arriving from the North Sea Sleipner East field in october 1993. It is important to Statoil to maintain regular gas delivers from its integrated transport network. In addition, high utilization of transport capacity maximizes profits. In advance of operations, Statoil realized that state-of-the-art supervisory control and data acquisition (scada) and pipeline-modeling systems (PMS) would be necessary to meet its goals and to remain the most efficient North Sea operator. The paper describes the linking of Troll and Zeebrugge, contractual issues, the supervisory system, the scada module, pipeline modeling, real-time model, look-ahead model, predictive model, and model performance.
- OSTI ID:
- 586084
- Journal Information:
- Oil and Gas Journal, Journal Name: Oil and Gas Journal Journal Issue: 12 Vol. 96; ISSN OIGJAV; ISSN 0030-1388
- Country of Publication:
- United States
- Language:
- English
Similar Records
Norway's Zeepipe project means more gas for Europe
Gas-metering test and research facility to meet North Sea needs
Subsea connection template will ease future Zeepipe expansion
Journal Article
·
Sat Aug 01 00:00:00 EDT 1992
· Pipeline and Gas Journal; (United States)
·
OSTI ID:7025970
Gas-metering test and research facility to meet North Sea needs
Journal Article
·
Sun Dec 11 23:00:00 EST 1988
· Oil Gas J.; (United States)
·
OSTI ID:6773571
Subsea connection template will ease future Zeepipe expansion
Journal Article
·
Mon May 03 00:00:00 EDT 1993
· Oil and Gas Journal; (United States)
·
OSTI ID:6487915