Hanford Environmental Dose Reconstruction Project: Monthly report

Technical Report ·
DOI:https://doi.org/10.2172/5842514· OSTI ID:5842514
This summary covers progress for the month of July 1989 during which we completed the scheduled milestone 0504-B, Measured River Fish Concentrations; presented a project status update at the TSP meeting on July 21 in Richland, WA; presented the potential role of iodine-129 in the HEDR Project at the TSP meeting; displayed posters at the TSP meeting summarizing available information for the Columbia River between Priest Rapids Dam and McNary Dam; held a working session on the dose calculational model with PNL staff, TSP members, and three members of the public; presented an overview of the HEDR Project's Quality Assurance (QA) program to six members of the TSP; continued internal PNL clearance on several draft reports, which will become part of the Phase I summary report; completed entry of meteorological data for 1983 through 1987 into the meteorological data base; completed verification of the modified MESOILT code; completed preliminary reviews of the analytical methods used as the basis for determining potential biases and the level of uncertainty for two milestones, 0504-B, Measured River Fish Concentrations and 0503-B, Final River and Sediment Monitoring Data; and completed the creation and verification of data files on radionuclide concentrations in vegetation through August 1946.
Research Organization:
Pacific Northwest Lab., Richland, WA (USA)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
5842514
Report Number(s):
PNL-6450-21-HEDR; ON: DE89016242
Country of Publication:
United States
Language:
English