Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Columbia River pathway report: phase I of the Hanford Environmental Dose Reconstruction Project

Technical Report ·
DOI:https://doi.org/10.2172/5578734· OSTI ID:5578734

This report summarizes the river-pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project. The HEDR Project is estimating radiation doses that could have been received by the public from the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the river-pathway dose reconstruction effort sought to determine whether dose estimates could be calculated for populations in the area from above the Hanford Site at Priest Rapids Dam to below the site at McNary Dam from January 1964 to December 1966. Of the potential sources of radionuclides from the river, fish consumption was the most important. Doses from drinking water were lower at Pasco than at Richland and lower at Kennewick than at Pasco. The median values of preliminary dose estimates calculated by HEDR are similar to independent, previously published estimates of average doses to Richland residents. Later phases of the HEDR Project will address dose estimates for periods other than 1964--1966 and for populations downstream of McNary Dam. 17 refs., 19 figs., 1 tab.

Research Organization:
Pacific Northwest Lab., Richland, WA (United States)
Sponsoring Organization:
DOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
5578734
Report Number(s):
PNL-7411-HEDR-Rev.1; ON: DE91016440
Country of Publication:
United States
Language:
English