Optimal set-point scheduling in a boiler-turbine system
Journal Article
·
· IEEE Trans. Power Electronics; (United States)
A 32nd order boiler-turbine model is developed to solve the optimal set-point scheduling problem for main and hot reheat steam conditions in a 235 MW gas fired electric generating plant. The optimization strategy uses control vector parameterization in which the boiler controller set-point function generators are modified to produce suboptimum signals. Constraints in the process variables are monitored by critical alarm limits, and hoop stresses in the heat exchanger tubes are estimated as well. Preliminary plant tests indicate these estimated savings may be realistic. The boiler-turbine model and optimization strategy illustrate the potential use of mathematical models for power plants.
- Research Organization:
- Dept. of Engineering Science, Trinity Univ., San Antonio, TX 78284
- OSTI ID:
- 5837461
- Journal Information:
- IEEE Trans. Power Electronics; (United States), Journal Name: IEEE Trans. Power Electronics; (United States) Vol. EC-2:3; ISSN ITCNE
- Country of Publication:
- United States
- Language:
- English
Similar Records
Optimal set-point scheduling in a boiler-turbine system
Turbine control system for sliding or constant pressure boilers
Multi-fuel optimization in boilers
Conference
·
Tue Dec 31 23:00:00 EST 1985
·
OSTI ID:5113565
Turbine control system for sliding or constant pressure boilers
Patent
·
Mon Mar 02 23:00:00 EST 1981
·
OSTI ID:6308938
Multi-fuel optimization in boilers
Conference
·
Tue Jun 01 00:00:00 EDT 1982
· Energy Technol. (Wash., D.C.); (United States)
·
OSTI ID:5363773
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200104* -- Fossil-Fueled Power Plants-- Components
99 GENERAL AND MISCELLANEOUS
990220 -- Computers
Computerized Models
& Computer Programs-- (1987-1989)
BOILERS
COMPUTERIZED CONTROL SYSTEMS
COMPUTERIZED SIMULATION
CONTROL EQUIPMENT
CONTROL SYSTEMS
EQUIPMENT
EQUIPMENT INTERFACES
GAS TURBINES
HEAT EXCHANGERS
MACHINERY
MONITORING
OPERATION
OPTIMIZATION
PERFORMANCE
PLANNING
POWER INPUT
POWER RANGE 10-100 MW
POWER RANGE 100-1000 MW
PUMPS
SCHEDULES
SIGNALS
SIMULATION
STEADY-STATE CONDITIONS
THERMODYNAMICS
TURBINES
TURBOMACHINERY
200104* -- Fossil-Fueled Power Plants-- Components
99 GENERAL AND MISCELLANEOUS
990220 -- Computers
Computerized Models
& Computer Programs-- (1987-1989)
BOILERS
COMPUTERIZED CONTROL SYSTEMS
COMPUTERIZED SIMULATION
CONTROL EQUIPMENT
CONTROL SYSTEMS
EQUIPMENT
EQUIPMENT INTERFACES
GAS TURBINES
HEAT EXCHANGERS
MACHINERY
MONITORING
OPERATION
OPTIMIZATION
PERFORMANCE
PLANNING
POWER INPUT
POWER RANGE 10-100 MW
POWER RANGE 100-1000 MW
PUMPS
SCHEDULES
SIGNALS
SIMULATION
STEADY-STATE CONDITIONS
THERMODYNAMICS
TURBINES
TURBOMACHINERY