Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

750 kV test line project announced

Journal Article · · Electr. Eng. (Am. Inst. Electr. Eng.); (United States)
OSTI ID:5815035
Announcement is made of plans to construct a 750-kV transmission line at Apple Grove, WV. Three test lines will be built at Apple Grove, each using a different conductor configuration. The lines will be energized simultaneously to measure radio-influence voltages and corona losses, permitting a comparison of test results under identical atmospheric conditions.
OSTI ID:
5815035
Journal Information:
Electr. Eng. (Am. Inst. Electr. Eng.); (United States), Journal Name: Electr. Eng. (Am. Inst. Electr. Eng.); (United States) Vol. 79; ISSN ELENA
Country of Publication:
United States
Language:
English