Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Relationship between regulatory issues and probabilistic risk assessments

Conference ·
OSTI ID:5798286
The objective of this study was to obtain some perspective on the characteristics and the relative number of regulatory issues that are PRA related, i.e., can be effectively addressed by plant specific PRA studies. It was also aimed at developing approaches to resolution of regulatory issues as part of plant specific PRAs. Several ongoing NRC programs include a number of safety-related issues which are applicable to operating plants. A number of these issues include aspects that strongly interact with items addressed in PRA studies. The resolution of several generic issues using PRA studies has already started. A review of over 335 issues included in three NRC programs was conducted: Generic Issue Program (GI); Systematic Evaluation Program (SEP); and TMI Action Plan (TMI). The review identifid 240 items related to PRA, 120 of which were judged to have significant effect on core damage frequency. It is believed that these items can be effectively treated in a PRA study that includes internal and external events.
Research Organization:
Brookhaven National Lab., Upton, NY (USA)
DOE Contract Number:
AC02-76CH00016
OSTI ID:
5798286
Report Number(s):
BNL-NUREG-35924; CONF-850610-22; ON: TI85007923
Country of Publication:
United States
Language:
English