How Gaz de France optimizes LNG regasification
Journal Article
·
· Oil Gas J.; (United States)
OSTI ID:5780319
A regasification optimization program was implemented at Montoir-de-Bretagne in 1984, and rapidly accepted by the operators. It has been an important tool for decision-making in the optimizing operation of this liquefied natural gas (LNG) storage and regasification terminal. The models used are regularly and easily updated on the basis of equipment behavior: aging or fouling. The Montoir-de-Bretagne LNG terminal is in the port area of Nates-Saint Nazaire on the Atlantic coast. It was commissioned in 1982 by Gaz de France. This terminal is used for receiving, storing, and regasifying the Algerian LNG received under a contract between Gaz de France and Sonatrach, as well as the LNG imported by Belgium and temporarily routed through France. It is designed to receive 25,000 to 200,000 cu m LNG carriers and has three 120,000 cm m LNG storage tanks. The daily sendout ranges between 6.7 million cu m and 36 million cu m. Monitor terminal supplies mainly Brittany and the Paris area. Two identifical berths allow the simultaneous reception of two LNG carriers. LNG is carried to the storage tanks in 32-in. lines at a rate of 12,000 cu m/hr. Each storage tank is equipped with three submerged 450 cu m/hr pumps with which the LNG is sent from the tanks to the secondary pumps at 8 bar. The nine high-pressure (HP) secondary pumps, with a capacity of either 450 cu m/hr or 180 cu m/hr, raise the LNG pressure to a level at least equal to pipeline pressure prior to revaporization.
- Research Organization:
- Gaz de France, Paris
- OSTI ID:
- 5780319
- Journal Information:
- Oil Gas J.; (United States), Journal Name: Oil Gas J.; (United States) Vol. 84:18; ISSN OIGJA
- Country of Publication:
- United States
- Language:
- English
Similar Records
The LNG situation in Europe
Monitor terminal has latest LNG technology
France/The Montoir LNG reception complex will be ready on time
Conference
·
Fri Dec 31 23:00:00 EST 1976
· Pap., Int. Conf. Liquefied Nat. Gas; (United States)
·
OSTI ID:7072038
Monitor terminal has latest LNG technology
Journal Article
·
Thu Mar 31 23:00:00 EST 1983
· Pipe Line Ind.; (United States)
·
OSTI ID:6036606
France/The Montoir LNG reception complex will be ready on time
Journal Article
·
Mon Sep 17 00:00:00 EDT 1979
· Pet. Inf. Ed. Int.; (United States)
·
OSTI ID:6156690
Related Subjects
03 NATURAL GAS
030400* -- Natural Gas-- Products & By-Products
AGING
CONTROL
DECISION MAKING
ENERGY SOURCES
EUROPE
EVAPORATION
FLUIDS
FOSSIL FUELS
FOULING
FRANCE
FUEL GAS
FUELS
GAS FUELS
GASES
GASIFICATION
LIQUEFIED GASES
LIQUEFIED NATURAL GAS
NATURAL GAS
OPTIMIZATION
PHASE TRANSFORMATIONS
PIPELINES
PRESSURE CONTROL
PROGRAMMING
PUMPS
SHIPS
STORAGE
TANKER SHIPS
TERMINAL FACILITIES
THERMOCHEMICAL PROCESSES
WESTERN EUROPE
030400* -- Natural Gas-- Products & By-Products
AGING
CONTROL
DECISION MAKING
ENERGY SOURCES
EUROPE
EVAPORATION
FLUIDS
FOSSIL FUELS
FOULING
FRANCE
FUEL GAS
FUELS
GAS FUELS
GASES
GASIFICATION
LIQUEFIED GASES
LIQUEFIED NATURAL GAS
NATURAL GAS
OPTIMIZATION
PHASE TRANSFORMATIONS
PIPELINES
PRESSURE CONTROL
PROGRAMMING
PUMPS
SHIPS
STORAGE
TANKER SHIPS
TERMINAL FACILITIES
THERMOCHEMICAL PROCESSES
WESTERN EUROPE