Risk-based technical specification improvements
Conference
·
· Transactions of the American Nuclear Society; (United States)
OSTI ID:5777331
- Yankee Atomic Electric Co., Bolton, MA (United States)
Technical specification limiting conditions for operation (LCOs) and surveillance test intervals (STIs) strive to ensure that equipment credited in the safety analysis is available and reliable and, thus, able to perform its intended functions should the need arise. Technical specification allowable outage times (AOTs) exist so that plant operation may continue (in the near term) while equipment important to safety is returned to operability. Because of the desire to provide operational flexibility and maximize safety system availability, revisions to technical specifications have been incorporated. Formal PRA methodology and insights have been applied that address both the positive and negative impact of proposed changes. Attributes addressed include the bases for existing requirements, the importance of the equipment in question, the likelihood of applicable scenarios, attendant consequences, and competing effects such as the risk due to mode transitions and plant shutdown. As a result of this effort, existing AOTs have been revised, STIs have been appropriately calibrated, and the application of corrective maintenance has improved. The last is the result of a more carefully though out and less stressful process of restoring equipment to operable status.
- OSTI ID:
- 5777331
- Report Number(s):
- CONF-910603--
- Conference Information:
- Journal Name: Transactions of the American Nuclear Society; (United States) Journal Volume: 63
- Country of Publication:
- United States
- Language:
- English
Similar Records
Handbook of methods for risk-based analysis of technical specifications
Risk impact of BWR technical specifications requirements during shutdown
Risk-based evaluation of AOT and STI requirements at ANO-1 nuclear power plant
Conference
·
Sun Sep 01 00:00:00 EDT 1996
·
OSTI ID:373936
Risk impact of BWR technical specifications requirements during shutdown
Technical Report
·
Sat Oct 01 00:00:00 EDT 1994
·
OSTI ID:10189564
Risk-based evaluation of AOT and STI requirements at ANO-1 nuclear power plant
Conference
·
Tue Dec 31 23:00:00 EST 1985
· Trans. Am. Nucl. Soc.; (United States)
·
OSTI ID:6882995
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210100 -- Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
210200 -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
22 GENERAL STUDIES OF NUCLEAR REACTORS
220900* -- Nuclear Reactor Technology-- Reactor Safety
ACCIDENTS
AVAILABILITY
BWR TYPE REACTORS
CALIBRATION
CONTAINMENT
CONTAINMENT SYSTEMS
ECCS
ENGINEERED SAFETY SYSTEMS
ENRICHED URANIUM REACTORS
EXHAUST SYSTEMS
FILTERS
INSPECTION
MAINTENANCE
OPERATION
POWER REACTORS
PWR TYPE REACTORS
RADIOACTIVITY TRANSPORT
REACTOR ACCIDENTS
REACTOR CORE DISRUPTION
REACTOR MAINTENANCE
REACTOR OPERATION
REACTOR PROTECTION SYSTEMS
REACTOR SAFETY
REACTORS
RELIABILITY
SAFETY
SCHEDULES
SPECIFICATIONS
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
210100 -- Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
210200 -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
22 GENERAL STUDIES OF NUCLEAR REACTORS
220900* -- Nuclear Reactor Technology-- Reactor Safety
ACCIDENTS
AVAILABILITY
BWR TYPE REACTORS
CALIBRATION
CONTAINMENT
CONTAINMENT SYSTEMS
ECCS
ENGINEERED SAFETY SYSTEMS
ENRICHED URANIUM REACTORS
EXHAUST SYSTEMS
FILTERS
INSPECTION
MAINTENANCE
OPERATION
POWER REACTORS
PWR TYPE REACTORS
RADIOACTIVITY TRANSPORT
REACTOR ACCIDENTS
REACTOR CORE DISRUPTION
REACTOR MAINTENANCE
REACTOR OPERATION
REACTOR PROTECTION SYSTEMS
REACTOR SAFETY
REACTORS
RELIABILITY
SAFETY
SCHEDULES
SPECIFICATIONS
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS