Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Risk impact of BWR technical specifications requirements during shutdown

Technical Report ·
DOI:https://doi.org/10.2172/10189564· OSTI ID:10189564
;  [1];  [2]
  1. Sandia National Labs., Albuquerque, NM (United States)
  2. Science Applications International Corp., Albuquerque, NM (United States)

This report presents an application of probabilistic models and risk based criteria for determining the risk impact of the Limiting Conditions of Operations (LCOs) in the Technical Specifications (TSs) of a boiling water reactor during shutdown. This analysis studied the risk impact of the current requirements of Allowed Outage Times (AOTs) and Surveillance Test Intervals (STIs) in eight Plant Operational States (POSs) which encompass power operations, shutdown, and refueling. This report also discusses insights concerning TS action statements.

Research Organization:
Nuclear Regulatory Commission, Washington, DC (United States). Div. of Systems Research; Sandia National Labs., Albuquerque, NM (United States); Science Applications International Corp., Albuquerque, NM (United States)
Sponsoring Organization:
Nuclear Regulatory Commission, Washington, DC (United States)
DOE Contract Number:
AC04-94AL85000
OSTI ID:
10189564
Report Number(s):
NUREG/CR--6166; SAND--93-3998; ON: TI95001503; BR: GB0103012
Country of Publication:
United States
Language:
English