Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

GEDEON 1: a first interpretation of a benchmark experiment for UO/sub 2/-Gd/sub 2/O/sub 3/ depletion in PWR assemblies

Conference · · Trans. Am. Nucl. Soc.; (United States)
OSTI ID:5773375
The French nuclear power program optimization requires an 18-month cycle strategy. This goal can be reached by using burnable absorbers. The selected material is gadolinium oxide because of its reprocessing capabilities. To qualify Framatome neutronics calculational methods for UO/sub 2/-Gd/sub 2/O/sub 3/ pins, two experiments were carried out in a joint venture with the Commissariat a l'Energie Atomique: CAMELEON, to study the interactions of undepleted UO/sub 2/-Gd/sub 2/O/sub 3/ ins and GEDEON 1, to investigate the depletion of UO/sub 2/-Gd/sub 2/O/sub 3/ pins. This paper presents a first interpretation of the results currently available on GEDEON 1. Since standard neutronic calculational methods are not applicable in the case of UO/sub 2/-Gd/sub 2/O/sub 3/, Framatome developed some new calculational methods, which have to be validated by comparison with the experiments.
Research Organization:
Framatome, Courbevoie, France
OSTI ID:
5773375
Report Number(s):
CONF-851115-
Conference Information:
Journal Name: Trans. Am. Nucl. Soc.; (United States) Journal Volume: 50
Country of Publication:
United States
Language:
English