U. S. -Canada pipeline contractors laid 8,665. 78 miles; foreign work 23,696. 3 miles in 1976
Journal Article
·
· Pipeline News; (United States)
OSTI ID:5749338
U.S. and Canadian pipeline construction for 1976 showed a gain of 1148 miles over the 1975 figure for projects awarded, under construction, or completed. Of the U.S. total of 6224 miles, natural-gas lines account for over 3000 miles. In Canada, 1921 miles of the 2441 total will be for gas lines. Foreign construction showed a large increase, with 23,638 miles laid in 1976 compared to 17,804 in 1975. Natural-gas lines accounted for over 44% of foreign installations. Extensive tabulations break down these totals by company and pipe diameter for natural-gas, products, and crude pipelines.
- OSTI ID:
- 5749338
- Journal Information:
- Pipeline News; (United States), Journal Name: Pipeline News; (United States) Vol. 49; ISSN PPLNA
- Country of Publication:
- United States
- Language:
- English
Similar Records
US-Canada contractors laid 7517. 63 miles transmission line in 1975
US-Canada pipe lines to construct 12,311. 99 miles; foreign projects 24,731. 10 miles
Pipe line capital needs to exceed $50 billion over next 15 years. [US and Canada]
Journal Article
·
Wed Dec 31 23:00:00 EST 1975
· Pipeline News; (United States)
·
OSTI ID:5692980
US-Canada pipe lines to construct 12,311. 99 miles; foreign projects 24,731. 10 miles
Journal Article
·
Wed Dec 31 23:00:00 EST 1975
· Pipeline News; (United States)
·
OSTI ID:5903235
Pipe line capital needs to exceed $50 billion over next 15 years. [US and Canada]
Journal Article
·
Wed Aug 01 00:00:00 EDT 1979
· Pipe Line Ind.; (United States)
·
OSTI ID:7037932