Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Sludge stabilization campaign blend plan. Revision 1

Technical Report ·
OSTI ID:57223

This Sludge Stabilization Blend Plan documents the material to be processed and the order of processing for the FY95 Sludge Stabilization Campaign. The primary mission of the process is to reduce the inventory of unstable plutonium bearing sludge. The source of the sludge is residual and glovebox sweepings from the production of material at the Plutonium Finishing Plant (PFP). The reactive sludge is currently being stored in various gloveboxes at PFP. The sludge is to be thermally stabilized in a glovebox in room 230A of the 234-5Z building and materials handling for the process will be done in room 230B of the same building. The campaign is scheduled for approximately 10 months. A total of roughly 23 kg of Pu will be processed.

Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
57223
Report Number(s):
WHC-SD-CP-TI--193-Rev.1; ON: DE95010054
Country of Publication:
United States
Language:
English

Similar Records

Ash Stabilization Campaign Blend Plan
Technical Report · Wed Jun 21 00:00:00 EDT 1995 · OSTI ID:100417

Sludge Stabilization Campaign blend plan
Technical Report · Tue Oct 04 00:00:00 EDT 1994 · OSTI ID:10190884

INERT Atmosphere confinement operability test procedure
Technical Report · Sun Feb 21 23:00:00 EST 1999 · OSTI ID:781514