Sludge stabilization campaign blend plan. Revision 1
This Sludge Stabilization Blend Plan documents the material to be processed and the order of processing for the FY95 Sludge Stabilization Campaign. The primary mission of the process is to reduce the inventory of unstable plutonium bearing sludge. The source of the sludge is residual and glovebox sweepings from the production of material at the Plutonium Finishing Plant (PFP). The reactive sludge is currently being stored in various gloveboxes at PFP. The sludge is to be thermally stabilized in a glovebox in room 230A of the 234-5Z building and materials handling for the process will be done in room 230B of the same building. The campaign is scheduled for approximately 10 months. A total of roughly 23 kg of Pu will be processed.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 57223
- Report Number(s):
- WHC-SD-CP-TI--193-Rev.1; ON: DE95010054
- Country of Publication:
- United States
- Language:
- English
Similar Records
Sludge Stabilization Campaign blend plan
INERT Atmosphere confinement operability test procedure