Ash Stabilization Campaign Blend Plan
This Stabilization Blend Plan documents the material to be processed and the processing order for the FY95 Ash Stabilization Campaign. The primary mission of this process is to reduce the inventory of unstable plutonium bearing ash. The source of the ash is from Rocky Flats and the 232-Z incinerator at the Plutonium Finishing Plant (PFP). The ash is currently being stored in Room 235B and Vault 174 in building 234-5Z. The sludge is to be thermally stabilized in a glovebox in room 230A of the 234-5Z building and material handling for the process will be done in room 230B of the same building. The campaign is scheduled for approximately 12--16 weeks. A total of roughly 4 kg of Pu will be processed.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 100417
- Report Number(s):
- WHC-SD-CP-TI--195; ON: DE95015549
- Country of Publication:
- United States
- Language:
- English
Similar Records
Sludge stabilization campaign blend plan. Revision 1
Sludge Stabilization Campaign blend plan
INERT Atmosphere confinement operability test procedure
Technical Report
·
Wed Mar 08 23:00:00 EST 1995
·
OSTI ID:57223
Sludge Stabilization Campaign blend plan
Technical Report
·
Tue Oct 04 00:00:00 EDT 1994
·
OSTI ID:10190884
INERT Atmosphere confinement operability test procedure
Technical Report
·
Sun Feb 21 23:00:00 EST 1999
·
OSTI ID:781514