10-MWe solar-thermal central-receiver pilot plant solar-facilities design integration. Piping and instrumentation diagrams (RADL item 2-16). Book 2
The mechanical process interfaces between the various solar subsystems and the electric power generation subsystem are identified as well as other interfaces within the solar subsystem and between the solar subsystems and various vendor furnished equipment. Tag number assignments for the various instrument and control components for the Barstow Solar Pilot Plant are identified. Also included is a line schedule of all needed piping. (LEW)
- Research Organization:
- McDonnell Douglas Astronautics Co., Huntington Beach, CA (USA)
- DOE Contract Number:
- AC03-79SF10499
- OSTI ID:
- 5719134
- Report Number(s):
- DOE/SF/10499-T28; SAN-0499-23-Bk.2; MDC-G-8217-Bk.2
- Country of Publication:
- United States
- Language:
- English
Similar Records
10 MWe solar-thermal central-receiver pilot plant solar-facilities design integration: control-loop diagrams (RADL Item 2-37, supplement)
Master equipment list (RADL Item 2-19). 10-MWe solar-thermal central-receiver pilot plant: solar facilities design integration
10-MWe solar-thermal central-receiver pilot plant, solar-facilities design integration: plant maintenance/training manual (RADL Item 2-37). Section 5. Process instrumentation, Book 1 of 2
Technical Report
·
Thu Oct 01 00:00:00 EDT 1981
·
OSTI ID:5352839
Master equipment list (RADL Item 2-19). 10-MWe solar-thermal central-receiver pilot plant: solar facilities design integration
Technical Report
·
Thu Jul 01 00:00:00 EDT 1982
·
OSTI ID:6741861
10-MWe solar-thermal central-receiver pilot plant, solar-facilities design integration: plant maintenance/training manual (RADL Item 2-37). Section 5. Process instrumentation, Book 1 of 2
Technical Report
·
Wed Jul 01 00:00:00 EDT 1981
·
OSTI ID:6506053