Design and construction of the Hondo sour gas pipeline
Conference
·
· Offshore Technol. Conf.; (United States)
OSTI ID:5697821
This 6.9 mile long subsea pipeline is designed to deliver 60 MMSCFD of sour natural gas from Exxon's ''Hondo A'' platform, which stands in 850' of water in the Santa Barbara Channel, to an onshore gas processing plant in Las Flores Canyon, 20 miles west of Santa Barbara, California. This 12'' pipeline is the deepest water line from a platform to shore off the U. S. West Coast and is believed to be the third deepest line ever installed from a platform to shore. This paper covers details of the final pipeline design and also describes the installation of the offshore portion of the pipeline.
- Research Organization:
- Applied Offshore Technology Inc.
- OSTI ID:
- 5697821
- Report Number(s):
- CONF-830514-
- Conference Information:
- Journal Name: Offshore Technol. Conf.; (United States) Journal Volume: 1
- Country of Publication:
- United States
- Language:
- English
Similar Records
Deepest offshore gas line completed on west coast
Construction of the Hondo Field pipeline by the reverse J-tube procedure
Mechanical subsea tie-in made in 825 feet of water
Journal Article
·
Thu Mar 31 23:00:00 EST 1983
· Pipeline Gas J.; (United States)
·
OSTI ID:5796555
Construction of the Hondo Field pipeline by the reverse J-tube procedure
Conference
·
Wed Dec 31 23:00:00 EST 1980
· Soc. Pet. Eng. AIME, Pap.; (United States)
·
OSTI ID:6222053
Mechanical subsea tie-in made in 825 feet of water
Journal Article
·
Fri Jul 01 00:00:00 EDT 1983
· Pipe Line Ind.; (United States)
·
OSTI ID:6835393