Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Field test facility for monitoring water/radionuclide transport through partially saturated geologic media: design, construction, and preliminary description. Appendix I. Engineering drawings

Technical Report ·
DOI:https://doi.org/10.2172/5697323· OSTI ID:5697323
The engineering plans for a test facility to monitor radionuclide transport in water through partially saturated geological media are included. Drawings for the experimental set-up excavation plan and details, lysimeter, pad, access caisson, and caisson details are presented. (DC)
Research Organization:
Battelle Pacific Northwest Labs., Richland, WA (USA)
DOE Contract Number:
EY-76-C-06-1830
OSTI ID:
5697323
Report Number(s):
PNL-3226(App.1)
Country of Publication:
United States
Language:
English