Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Electric Utility Rate Design Study: comments on two costing approaches for time-differentiated rates

Technical Report ·
OSTI ID:5681253
A critique of consultants' reports on Topic 4 (Costing for Peak-Load Pricing) of EEI/EPRI Electric Utility Rate Design Study is presented. Correlated areas of Topic 1.3 are identified. The first critique is of NERA's August 15, 1976 Draft Report on How to Quantify Marginal Costs. The second critique is of Ebasco Services, Inc., September 8, 1976 Draft Report on Costing for Peak-Load Pricing. References made to Topic 1.3 refer to the September 15, 1976 Ebasco draft of Topic 1.3. (MCW)
Research Organization:
Electric Power Research Inst., Palo Alto, CA (USA)
OSTI ID:
5681253
Report Number(s):
NP-24290
Country of Publication:
United States
Language:
English