Electric Utility Rate Design Study: comments on Ebasco Service's approach to peak-load pricing
Ebasco's studies were aimed at showing how the different costs of time-differentiated services can be ascertained and how such costs can be used to make time-differentiated rates. Dr. Walter A. Morton, a consultant, was retained by EPRI to comment on portions of Ebasco's reported research; here he makes a general evaluation on the studies, but specifically on Topic 1.3: Pricing Approaches; Topic 4: Cost for Peak-Load Pricing; Topic 5: Ratemaking; and a final evaluation concerning application to Virginia Electric and Power Company. Two appendices are included; Utility Earnings and Time-Differentiated Rates and Temperature-Sensitive Rates. (MCW)
- Research Organization:
- Electric Power Research Inst., Palo Alto, Calif. (USA)
- OSTI ID:
- 5284916
- Report Number(s):
- NP-22550
- Country of Publication:
- United States
- Language:
- English
Similar Records
Electric Utility Rate Design Study: Ebasco's responses to questions from Task Force 4, Topic 4. [Peak-load pricing questions and answers]
Electric Utility Rate Design Study: comments on two costing approaches for time-differentiated rates
Electric Utility Rate Design Study: comments on two costing approaches for time-differentiated rates
Technical Report
·
Fri Sep 30 00:00:00 EDT 1977
·
OSTI ID:5225383
Electric Utility Rate Design Study: comments on two costing approaches for time-differentiated rates
Technical Report
·
Mon Mar 07 23:00:00 EST 1977
·
OSTI ID:5681253
Electric Utility Rate Design Study: comments on two costing approaches for time-differentiated rates
Technical Report
·
Mon Mar 07 23:00:00 EST 1977
·
OSTI ID:5225389