Pipe line capital needs to exceed 50 billion dollars over next 15 years
Capital requirements for pipeline construction in the US and Canada over the next 15 years are expected to total 50.8 billion dollars (1975 dollars). Capital requirements for gas pipelines will account for 18.3 billion dollars, crude lines 4.9 billion dollars, and products lines 3.8 billion dollars. Cost of building coal slurry systems is excluded. New pipeline construction during the same period is estimated to total 52,275 miles (gas lines 23,777 miles). Product projects will exceed 18,000 miles and crude oil lines add up to 10,098 miles. Presently, more than 1800 miles of gas, crude, and product lines are under construction in the US, with another 1500 miles expected to start before 1980. Lines under construction, proposed, planned or under study in Canada are also discussed.
- OSTI ID:
- 5636720
- Journal Information:
- Pipe Line Ind.; (United States), Journal Name: Pipe Line Ind.; (United States) Vol. 51:2; ISSN PLINA
- Country of Publication:
- United States
- Language:
- English
Similar Records
Pipeline activity continues rapid pace
World pipeline work set for rapid growth
Related Subjects
020500 -- Petroleum-- Products & By-Products
022000* -- Petroleum-- Transport
Handling
& Storage
03 NATURAL GAS
032000 -- Natural Gas-- Transport
Handling
& Storage
CANADA
CAPITALIZED COST
CARBONACEOUS MATERIALS
COAL
CONSTRUCTION
COST
ENERGY SOURCES
ENERGY SYSTEMS
FLUIDS
FOSSIL FUELS
FREIGHT PIPELINES
FUEL GAS
FUELS
GAS FUELS
GASES
INVESTMENT
MATERIALS
NATURAL GAS
NATURAL GAS DISTRIBUTION SYSTEMS
NORTH AMERICA
PETROLEUM
PETROLEUM PRODUCTS
PIPELINES
PLANNING
SLURRY PIPELINES
TRANSPORT
USA