Feasibility study for early removal of HEU from CPP-651-Phase II

Technical Report ·
DOI:https://doi.org/10.2172/563211· OSTI ID:563211
A two-phase feasibility study was initiated in late 1996 to identify a way to expedite the removal of SNM from the CPP-651 vault. The first phase of this study provided preliminary information that appeared promising, but needed additional detailed planning and evaluate to validate the concepts and conclusions. The focus of Phase 2 was to provide the validation via resource-loaded schedules and more detailed cost estimates. Section 1 describes the purpose and objectives of the Phase 2 tasks and the programmatic drivers that influence related CPP-651 high-enriched uranium (HEU) management issues. Section 2 identifies the evaluation criteria and methodology and the transfer issues and barriers preventing shipment. Section 3 provides site-specific background information for the CPP-651 facility and the Idaho National Engineering and Environmental Laboratory (INEEL) and describes the development of the basic material removal schedule, the proposed base case plan for removal of SNM, and the proposed HEU material management/shipping issues and strategies. Section 4 identifies the proposed options for accelerated removal of SNM and how they were evaluated via detailed scheduling, resource histograms, and cost analysis. Section 5 summarizes principal tasks for implementing this plan and other related HEU CPP-651 management issues that require continued planning efforts to assure successful implementation of this proposed early removal strategy.
Research Organization:
Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC07-94ID13223
OSTI ID:
563211
Report Number(s):
INEEL/EXT--97-00977; ON: DE98050369
Country of Publication:
United States
Language:
English