Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Technical considerations for flexible piping design in nuclear power plants

Conference ·
OSTI ID:5631952
The overall objective of this research project is to develop a technical basis for flexible piping designs which will improve piping reliability and minimize the use of pipe supports, snubbers, and pipe whip restraints. The current study was conducted to establish the necessary groundwork based on the piping reliability analysis. A confirmatory piping reliability assessment indicated that removing rigid supports and snubbers tends to either improve or affect very little the piping reliability. A couple of changes to be implemented in Regulatory Guide (RG) 1.61 and RG 1.122 aimed at more flexible piping design were investigated. It was concluded that these changes substantially reduce calculated piping responses and allows piping redesigns with significant reduction in number of supports and snubbers without violating ASME code requirements.
Research Organization:
Lawrence Livermore National Lab., CA (USA)
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
5631952
Report Number(s):
UCRL-92398; CONF-850670-9; ON: DE85010039
Country of Publication:
United States
Language:
English