Engineering report on drilling in the Black Hills, South Dakota
The Black Hills drilling project was conducted by Bendix Field Engineering Corporation (BFEC) in support of the US Department of Energy (DOE) National Uranium Resource Evaluation (NURE) program. The project consisted of five drill holes, ranging in depth from 365 feet (111.25 m) to 564 feet (171.90 m). A total of 2,211 feet (673.91 m) were drilled, all of which were cored. The objective of the project was to obtain subsurface data which would enable us to more accurately assess the favorability of the Precambrian Estes Conglomerate as a host of World Class uranium deposits. Drilling began on August 3, 1979, and concluded on September 7, 1979, with final site restoration and clean-up.
- Research Organization:
- Bendix Field Engineering Corp., Grand Junction, CO (USA)
- DOE Contract Number:
- EY-76-C-13-1664
- OSTI ID:
- 5627712
- Report Number(s):
- GJBX-17(80)
- Country of Publication:
- United States
- Language:
- English
Similar Records
Engineering report on the Brushy Basin drilling project, Cedar Mountain, Emery County, Utah
Engineering report on the Great Divide Basin drilling project Sweetwater County, Wyoming, May 1980
Engineering report on the drilling in the Spor Mountain area of Utah
Technical Report
·
Fri Feb 29 23:00:00 EST 1980
·
OSTI ID:5529948
Engineering report on the Great Divide Basin drilling project Sweetwater County, Wyoming, May 1980
Technical Report
·
Tue Jul 01 00:00:00 EDT 1980
·
OSTI ID:5289511
Engineering report on the drilling in the Spor Mountain area of Utah
Technical Report
·
Sun Jul 01 00:00:00 EDT 1979
·
OSTI ID:6083316