Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Engineering report on the drilling in the Spor Mountain area of Utah

Technical Report ·
DOI:https://doi.org/10.2172/6083316· OSTI ID:6083316

The Spor Mountain Drilling Project was conducted by Bendix Field Engineering Corporation in support of the United States Department of Energy (DOE) National Uranium Resource Evaluation (NURE) program. This project consisted of 30 drill holes, ranging in depth from 372 feet (113.39 m) to 2,525 feet (769.62 m). A total of 33,143 feet (10,101.99 m) were drilled, of which 11,579 feet (3,529.28 m) were cored. The objective of the project was to test the continuity of uranium bearing host rocks, including the Beryllium Tuff and Yellow Chief sandstones, in several geologically favorable areas of the Thomas Range. This project began June 22, 1978, and continued through May 1979 with final site restoration and cleanup.

Research Organization:
Bendix Field Engineering Corp., Grand Junction, CO (USA)
DOE Contract Number:
EY-76-C-13-1664
OSTI ID:
6083316
Report Number(s):
GJBX-103(79)
Country of Publication:
United States
Language:
English