Outline of plan for advanced reheat gas turbine

Journal Article · · J. Eng. Power; (United States)
DOI:https://doi.org/10.1115/1.3230800· OSTI ID:5617932
A new reheat gas turbine system is being developed in Japan. The machine consists of two axial flow compressors, three turbines, intercooler, combustor and reheater. The pilot plant is expected to go into operation in 1982, and a prototype plant will be set up in 1984. The major objective of this reheat gas turbine is application to a combined cycle power plant, with LNG burning, and the final target of combined cycle thermal efficiency is to be 55 percent (LHV).
Research Organization:
Eng Res Assoc for Adv Gas Turbines, Tokyo, Jpn
OSTI ID:
5617932
Journal Information:
J. Eng. Power; (United States), Journal Name: J. Eng. Power; (United States) Vol. 103:4; ISSN JEPOA
Country of Publication:
United States
Language:
English