Snettisham Project Alaska. First stage development. Design memorandum Number 7. General design memorandum. Volume I. Main report

Technical Report ·
OSTI ID:5601404

The Snettisham Project consists of a plan to construct a concrete gravity dam at the outlet of Long Lake (near the mouth of Speel River, 28 airmiles southeast of Juneau, Alaska) to raise the lake to elevation 895 and to drill a 8,175-foot power tunnel and a 1,710-foot penstock from Long Lake to a 40,600 KW powerplant at tidewater. Tunnel intake, trashrack and surge tank are included in the waterways construction. From the switchyard, adjacent to the powerplant, a 47.3-mile, 138,00-volt transmission line will extend to a substation near Juneau. Drill a 6,000-foot power tunnel and a 1,690-foot penstock tunnel from Crater Lake to the powerhouse. Increase the powerhouse capacity to 60,900 KW.

Research Organization:
Corps of Engineers, Anchorage, AK (USA)
OSTI ID:
5601404
Report Number(s):
AD-A-067894
Country of Publication:
United States
Language:
English