Femp HVAC upgrade projects, Fort Riley, Kansas
Technical Report
·
OSTI ID:557365
The proposed construction consists of upgrading the HVAC systems in the dental clinics, Buildings 602, 7665, and 7670. The HVAC system upgrades include the following: Convert the existing dual duct air handling unit (AHU) serving Building 602 to a variable-air-volume (VAV) AHU. A variable speed drive (VSD) will be installed to control the supply fan speed. The existing dual duct mixing boxes will be replaced with dual duct VAV terminal units. The existing ductwork will remain. Convert the existing multizone AHU serving Building 7665 to a VAV AHU. A VSD will be installed to control the supply and return fan speed. VAV terminal units with reheat coils will be installed on the zone supply air ducts. The existing ductwork will remain. Convert the existing dual duct AHU serving Building 7670 to a VAV AHU. A VSD will be installed to control the supply and return fan speed. The existing dual duct mixing boxes will be replaced with dual duct VAV terminal units. The existing ductwork will remain.
- Research Organization:
- EMC Engineers, Inc., Denver, CO (United States)
- OSTI ID:
- 557365
- Report Number(s):
- AD-A--330239/5/XAB; CNN: Contract DACA01-94-D-0033
- Country of Publication:
- United States
- Language:
- English
Similar Records
Duct leakage impacts on VAV system performance in California large commercial buildings
A generalized multiple-spaces equation to accommodate any mix of close-off and fan-powered VAV boxes
A practical dual-duct retrofit
Technical Report
·
Wed Oct 01 00:00:00 EDT 2003
·
OSTI ID:819481
A generalized multiple-spaces equation to accommodate any mix of close-off and fan-powered VAV boxes
Book
·
Thu Oct 31 23:00:00 EST 1996
·
OSTI ID:392446
A practical dual-duct retrofit
Journal Article
·
Tue Feb 28 23:00:00 EST 1995
· Heating, Piping and Air Conditioning
·
OSTI ID:51726