Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

TMI-2 Defueling System design description

Technical Report ·
DOI:https://doi.org/10.2172/5571102· OSTI ID:5571102

This document provides a summary level description of the TMI-2 Dry Defueling System. Defueling will take place through the IIF above the reactor vessel. A Shielded Work Platform and Shielded Support Structure will be assembled around the IIF. Defueling equipment will be mounted on and operated from the Shielded Work Platform. Defueling operations will progress from fairly simple pick and place operations and vacuuming up to more complex cutting and other debris removal tasks.

Research Organization:
Westinghouse Electric Corp., Madison, PA (USA). Waste Technology Services Div.
DOE Contract Number:
AC07-76ID01570
OSTI ID:
5571102
Report Number(s):
GEND-INF-065; ON: DE85014611
Country of Publication:
United States
Language:
English