Total capital cost data base: 10MWe Solar Thermal Central Receiver Pilot Plant

Technical Report ·
DOI:https://doi.org/10.2172/5556814· OSTI ID:5556814
This report describes the total capital cost data base of the 10 MWe Solar Thermal Central Receiver Pilot Plant. This Solar One cost data base was created using the computer code ''Cost Data Management System (CDMS)''. The cost data base format was developed to be used as a common method of presentation of capital costs for power plants. The basic format is a plant system cost breakdown structure. Major accounts are land; structures and improvements; collector, receiver, thermal transport, thermal storage, and stream generation systems; turbine plant; electrical plant; miscellaneous plant systems and equipment; and plant-level indirect costs. Each major account includes subaccounts to as many as nine level of detail. The data base can be accessed to provide elements-of-work costs at any subaccount level or at the plant level. The elements-of-work include sitework/earthwork; concrete work; metal work; architectural; process equipment; piping; electrical; and miscellaneous work. Each of these elements-of-work can be or are broken into finer detail and costs can be accumulated to identify more specific needs, e.g., pipe insulation or heat exchangers. The cost data base can be accessed and various reports can be generated. These vary from a single page summary to detailed listings of costs and notes. Reported costs can be stated in dollars, dollars per kilowatt or percentage of the total plant cost. Reports or samples of reports for the pilot plant capital cost are included.
Research Organization:
Sandia National Labs., Livermore, CA (USA)
DOE Contract Number:
AC04-76DR00789
OSTI ID:
5556814
Report Number(s):
SAND86-8002; ON: DE86011388
Country of Publication:
United States