skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: The Relativistic Heavy Ion Collider control system

Conference ·
OSTI ID:554867

The Relativistic Heavy Ion Collider control system has been used in the commissioning of the AGS to RHIC transfer line and in the first RHIC sextant test. Much of the controls infrastructure for networks and links has been installed throughout the collider. All of the controls hardware modules needed to be built for early RHIC operations have been designed and tested. Many of these VME modules are already being used in normal AGS operations. Over 150 VME based front end computers and device controllers will be installed by the Summer of 1998 in order to be ready for Fall of 1998. A few features are being added to the front end computer core software. The bulk of the Accelerator Device Objects (ADOs) which are instantiated in the FECs, have been written and tested in the early commissioning. A configuration database has been designed. Generic control and display of ADO parameters via a spreadsheet like program on the console level computers was provided early on in the control system development. User interface tools that were developed for the AGS control system have been used in RHIC applications. Some of the basic operations programs, like alarm display and save/restore, that are used in the AGS operations have been or will be expanded to support RHIC operations. A model for application programs which involves a console level manager servicing ADOs have been verified with a few RHIC applications. More applications need to be written for the Fall of 1998 commissioning effort. A sequencer for automatic control of the fill is being written with the expectation that it will be useful in early commissioning.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States)
Sponsoring Organization:
USDOE Office of Energy Research, Washington, DC (United States)
DOE Contract Number:
AC02-76CH00016
OSTI ID:
554867
Report Number(s):
BNL-64922; CONF-971171-; ON: DE98001351; BR: KA0403000; TRN: 98:008883
Resource Relation:
Conference: 1997 international conference on accelerator and large experimental physics control systems, Beijing (China), 3-9 Nov 1997; Other Information: PBD: [1997]
Country of Publication:
United States
Language:
English

Similar Records

RHIC beam loss monitor system design
Conference · Tue Jul 01 00:00:00 EDT 1997 · OSTI ID:554867

RHIC instrumentation
Journal Article · Tue Dec 01 00:00:00 EST 1998 · AIP Conference Proceedings · OSTI ID:554867

Reinforcement learning based schemes to manage client activities in large distributed control systems
Journal Article · Wed Jan 02 00:00:00 EST 2019 · Physical Review Accelerators and Beams · OSTI ID:554867