skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: RHIC instrumentation

Journal Article · · AIP Conference Proceedings
DOI:https://doi.org/10.1063/1.56996· OSTI ID:344456
;  [1]
  1. Brookhaven National Laboratory Upton, New York 11973 (United States)

The Relativistic Heavy Ion Collider (RHIC) consists of two 3.8 km circumference rings utilizing 396 superconducting dipoles and 492 superconducting quadrupoles. Each ring will accelerate approximately 60 bunches of 10{sup 11} protons to 250 GeV, or 10{sup 9} fully stripped gold ions to 100 GeV/nucleon. Commissioning is scheduled for early 1999 with detectors for some of the 6 intersection regions scheduled for initial operation later in the year. The injection line instrumentation includes: 52 beam position monitor (BPM) channels, 56 beam loss monitor (BLM) channels, 5 fast integrating current transformers and 12 video beam profile monitors. The collider ring instrumentation includes: 667 BPM channels, 400 BLM channels, wall current monitors, DC current transformers, ionization profile monitors (IPMs), transverse feedback systems, and resonant Schottky monitors. The use of superconducting magnets affected the beam instrumentation design. The BPM electrodes must function in a cryogenic environment and the BLM system must prevent magnet quenches from either fast or slow losses with widely different rates. RHIC is the first superconducting accelerator to cross transition, requiring close monitoring of beam parameters at this time. High space-charge due to the fully stripped gold ions required the IPM to collect magnetically guided electrons rather than the conventional ions. Since polarized beams will also be accelerated in RHIC, additional constraints were put on the instrumentation. The orbit must be well controlled to minimize depolarizing resonance strengths. Also, the position monitors must accommodate large orbit displacements within the Siberian snakes and spin rotators. The design of the instrumentation will be presented along with results obtained during bench tests, the injection line commissioning, and the first sextant test. {copyright} {ital 1998 American Institute of Physics.}

Sponsoring Organization:
USDOE
OSTI ID:
344456
Report Number(s):
CONF-980573-; ISSN 0094-243X; TRN: 99:005648
Journal Information:
AIP Conference Proceedings, Vol. 451, Issue 1; Conference: 8. beam instrumentation workshop (BIW-98), Stanford, CA (United States), 4-7 May 1998; Other Information: PBD: Dec 1998
Country of Publication:
United States
Language:
English

Similar Records

RHIC instrumentation
Journal Article · Thu Dec 10 00:00:00 EST 1998 · AIP Conference Proceedings · OSTI ID:344456

A Prototype Ionization Profile Monitor for RHIC
Technical Report · Mon Mar 17 00:00:00 EST 1997 · OSTI ID:344456

Preparing accelerator systems for the RHIC sextant commissioning
Conference · Tue Jul 01 00:00:00 EDT 1997 · OSTI ID:344456