Turlock harnesses power in its irrigation canal. [Hickman, CA; two 500-kW generators]
Journal Article
·
· Public Power; (United States)
OSTI ID:5536294
The Turlock Irrigation District (TID) has harnessed a 17-foot water drop in its prinicpal irrigation canal to power two 500-kilowatt generators. The eight-month irrigation season will provide power during the region's peak electrical demand for air conditioning. The economics for exploiting low-head hydroelectric power did not develop in this country until fuel costs began to rise. While inadequate for total energy needs, these projects are a step toward energy independence. An extensive feasibility study preceded TID's choice of two sites for low-head hydro development. Much of the engineering and construction work was done in-house to cut cots. TID reserves are financing the project. (DCK)
- OSTI ID:
- 5536294
- Journal Information:
- Public Power; (United States), Journal Name: Public Power; (United States) Vol. 37:6; ISSN PUPOA
- Country of Publication:
- United States
- Language:
- English
Similar Records
Turlock Irrigation District Drop No. 1 Power Plant: Final operation and maintenance report. Small-scale hydroelectric-power demonstration project
Harnessing the Hydroelectric Potential of Engineered Drops (Final Technical Report)
Turlock Lake Powerhouse. Turlock Irrigation District design report and operations manual
Technical Report
·
Thu Mar 31 23:00:00 EST 1983
·
OSTI ID:6373352
Harnessing the Hydroelectric Potential of Engineered Drops (Final Technical Report)
Technical Report
·
Fri May 01 00:00:00 EDT 2020
·
OSTI ID:1616754
Turlock Lake Powerhouse. Turlock Irrigation District design report and operations manual
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:6782882