Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Review of the Catawba Units 1 and 2 auxiliary feedwater system reliability analysis

Technical Report ·
OSTI ID:5532715
This report presents the results of a review of the Auxiliary Feedwater System Reliability Analysis for Catawba Units 1 and 2. The objective of this report is to estimate the probability that the Auxiliary Feedwater System will fail to perform its mission for each of three different initiators: (1) loss of main feedwater with offsite power available, (2) loss of offsite power, (3) loss of all ac power except for vital instrumentation and control power. The scope, methodology, and failure data are prescribed by NUREG-0611, Appendix III. The results are compared with those obtained in NUREG-0611 for other Westinghouse plants.
Research Organization:
Brookhaven National Lab., Upton, NY (USA)
DOE Contract Number:
AC02-76CH00016
OSTI ID:
5532715
Report Number(s):
NUREG/CR-3297; BNL-NUREG-51675; ON: DE84004560
Country of Publication:
United States
Language:
English