Validation and integration of critical PWR signals for safety parameter display systems
Technical Report
·
OSTI ID:5505090
This document describes the progress to date and the functional requirements generated for EPRI Project RP-2292-1, ''Validation and Integration of Critical PWR Signals.'' The purpose of the project is to develop a methodology and a system of computer software for on-line validation of signals for use in nuclear power plants. The project scope is limited to validation of signals which input to a Safety Parameter Display System, however, the methodology generated is to have generic applicability. A Utility Advisory Group periodically reviews status and helps provide project direction. The methodology developed is being applied to produce signal validation software for a host plant, Northeast Utilities' Millstone-2 plant. The generic capability of the software will be checked by analysis of Commonwealth Edison's Zion plant. System design first identifies the functions which require validated inputs. Then variables which define the functions are identified. Finally, the sensors which provide a value for each variable are identified. Signal validation techniques are applied to the list of variables depending on the number of sensors for a variable. In each case software modules are to be developed for each variable. Preliminary algorithms for the Millstone-2 modules using physically redundant sensors have been generated, but still require detailed design work to make them generic. Conceptual design of modules that use complex functional relationships is still in progress. Requirements for the signal validation system are provided. Requirements for the system design, computer system software and hardware, input/output format, and testing are addressed.
- Research Organization:
- Babcock and Wilcox Co., Lynchburg, VA (USA). Nuclear Power Div.
- OSTI ID:
- 5505090
- Report Number(s):
- EPRI-NP-4566; ON: TI86920360
- Country of Publication:
- United States
- Language:
- English
Similar Records
Validation of critical signals for the safety parameter display system: Final report
EPRI-sponsored demonstration of signal validation at BWR and PWR nuclear stations
Improvement of availability of PWR nuclear plants through the reduction of the time required for refueling/maintenance outages
Technical Report
·
Tue Mar 31 23:00:00 EST 1987
·
OSTI ID:6541428
EPRI-sponsored demonstration of signal validation at BWR and PWR nuclear stations
Conference
·
Thu Jan 31 23:00:00 EST 1985
· IEEE Trans. Nucl. Sci.; (United States)
·
OSTI ID:5124859
Improvement of availability of PWR nuclear plants through the reduction of the time required for refueling/maintenance outages
Technical Report
·
Fri Mar 31 23:00:00 EST 1978
·
OSTI ID:6939790
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210200 -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
22 GENERAL STUDIES OF NUCLEAR REACTORS
220900* -- Nuclear Reactor Technology-- Reactor Safety
COMPUTERIZED CONTROL SYSTEMS
CONTROL SYSTEMS
DESIGN
DISPLAY DEVICES
EMERGENCY PLANS
ENGINEERED SAFETY SYSTEMS
PWR TYPE REACTORS
REACTORS
SIGNALS
TESTING
VALIDATION
WATER COOLED REACTORS
WATER MODERATED REACTORS
210200 -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
22 GENERAL STUDIES OF NUCLEAR REACTORS
220900* -- Nuclear Reactor Technology-- Reactor Safety
COMPUTERIZED CONTROL SYSTEMS
CONTROL SYSTEMS
DESIGN
DISPLAY DEVICES
EMERGENCY PLANS
ENGINEERED SAFETY SYSTEMS
PWR TYPE REACTORS
REACTORS
SIGNALS
TESTING
VALIDATION
WATER COOLED REACTORS
WATER MODERATED REACTORS