Methodology of selecting dozers for lignite open pit mines in Serbia
Conference
·
OSTI ID:549518
- Univ. of Belgrade (Yugoslavia). Faculty of Mining and Geology
- Public Co. State Electricity Serbia, Belgrade (Yugoslavia)
Apart from the main production processes (coal and overburden mining, rail conveyors transportation and storage of excavated masses) performed by great-capacity mechanization at open pit mines, numerous and different auxiliary works, that often have crucial influence on both the work efficiency of main equipment and the maintenance of optimum technical conditions of machines and plants covering technological system of open pit, are present. Successful realization of work indispensably requires a proper and adequate selection of auxiliary machines according to their type quantity, capacity, power etc. thus highly respecting specific conditions existing at each and every open pit mine. A dozer is certainly the most important and representative auxiliary machine at single open pit mine. It is widely used in numerous works that, in fact, are preconditions for successful work of the main mechanization and consequently the very selection of a dozer ranges among the most important operations when selecting mechanization. This paper presents the methodology of dozers selection when lignite open pit mines are concerned. A mathematical model defining the volume of work required for dozers to perform at open pit mines and consequently the number of necessary dozers was designed. The model underwent testing in practice at big open pit mines and can be used in design of future open pits mines.
- OSTI ID:
- 549518
- Report Number(s):
- CONF-960954--
- Country of Publication:
- United States
- Language:
- English
Similar Records
In-pit conveyors and crushers cut surface mining costs
Design, fabricate and test dozer trap. Phase I report
Development of a conveyor-type cross pit overburden and material handling system. Final report 23 Jun 75--21 Dec 76
Journal Article
·
Mon Jul 01 00:00:00 EDT 1985
· Coal Age; (United States)
·
OSTI ID:6022774
Design, fabricate and test dozer trap. Phase I report
Technical Report
·
Wed Mar 31 23:00:00 EST 1982
·
OSTI ID:5272671
Development of a conveyor-type cross pit overburden and material handling system. Final report 23 Jun 75--21 Dec 76
Technical Report
·
Mon Dec 20 23:00:00 EST 1976
·
OSTI ID:7301560