Southeast Alaska intertie dc transmission system: reconnaissance design and cost estimate. Appendix I

Technical Report ·
OSTI ID:5492406

The detailed costs of the schemes are given in this Appendix. The conceptual designs of the sea electrodes for the schemes are also described. The cost estimates for the electrodes were based on these conceptual designs. A cost comparison of ac and dc transmission for 10 MW from Ketchikan to Tolstoi Bay is given along with an example outlining the procedure for selecting the optimum dc cable size.