Loading directly from seafloor wellhead. [North Sea]
Kongsberg Engineering a.s. has developed an oil loading system for the Central North Sea, in 492-ft waters, which is not permanent, is safer, economical and withstands the environmental forces in the area. The ''Subload'' system is based on loading directly from a seafloor terminal to two 78,000 dwt dynamically positioned shuttle tankers. Upon arrival at the field, a shuttle tanker fitted with an SPM loading yoke and a riser reel deploys a 16-in. flexible riser attached to a lower riser package fitted with thrusters. Controlled by signals from a special high-accuracy underwater maneuver the lower riser end into docking position with the seafloor terminal. The terminal is located at the end of a two-km, 28-in. pipe line from the production platform. Presentation of the system, the company said that the diverless hookup procedure between the intrument-controlled riser connection and the subsea wellhead requires 45 minutes. The shuttle tanker loading could be completed twice a day in seven and a half hours per operation.
- OSTI ID:
- 5463755
- Journal Information:
- Ocean Ind.; (United States), Vol. 16:6
- Country of Publication:
- United States
- Language:
- English
Similar Records
Santa Barbara Salm. a prototype deepwater production riser and floating production system
Offshore loading-system design is aimed at higher efficiency