Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document IC 1. Final report
Technical Report
·
OSTI ID:5415152
This document supports the use of soil vapor extraction (SVE) as the non-time-critical removal action for selected areas with high levels of volatile organic compound (VOC) contamination in Investigation Cluster 1 (IC 1), which is located near the center of Operable Unit B (OU B). This SVE removal action is part of the initial basewide SVE removal action at McClellan Air Force Base (McAFB). The principal objective of basewide SVE removal actions is to achieve early risk reduction by removing a significant quantity of VOCs from soils in the vadose zone, intercepting an exposure pathway, or preventing additional VOC flux to groundwater.
- Research Organization:
- McClellan AFB, CA (United States)
- OSTI ID:
- 5415152
- Report Number(s):
- AD-A-273523/1/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document IC 7. Draft final report
Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document IC-1. Final report
Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document OU D/site 3. Final report
Technical Report
·
Wed Sep 01 00:00:00 EDT 1993
·
OSTI ID:5598421
Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document IC-1. Final report
Technical Report
·
Wed Sep 01 00:00:00 EDT 1993
·
OSTI ID:5598449
Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document OU D/site 3. Final report
Technical Report
·
Sun Oct 31 23:00:00 EST 1993
·
OSTI ID:5367799