Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document OU D/site 3. Final report
Technical Report
·
OSTI ID:5367799
This document supports the use of soil vapor extraction (SVE) as the non-time-critical removal action for areas contaminated with volatile organic compounds (VOCs) in the vadose zone around Site 3, which is located in Operable Unit D (OU D). This SVE removal action is part of the initial basewide SVE removal action at McClellan Air Force Base (McAFB). The principal objective of the basewide SVE removal action is to achieve early risk reduction by removing a significant quantity of VOCs from soils in the vadose-zone, intercepting an exposure pathway, or preventing additional VOC flux to groundwater.
- Research Organization:
- McClellan AFB, CA (United States)
- OSTI ID:
- 5367799
- Report Number(s):
- AD-A-273539/7/XAB
- Country of Publication:
- United States
- Language:
- English
Similar Records
Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document OU-D/site 3. Final report
Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document OU-D/site S. Final report
Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document OU D/site S. Final report
Technical Report
·
Wed Sep 01 00:00:00 EDT 1993
·
OSTI ID:5598443
Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document OU-D/site S. Final report
Technical Report
·
Wed Sep 01 00:00:00 EDT 1993
·
OSTI ID:5817213
Basewide engineering evaluation-cost analysis for soil vapor extraction. Site specific document OU D/site S. Final report
Technical Report
·
Sun Oct 31 23:00:00 EST 1993
·
OSTI ID:5367803