Design of TLP drilling package requires detailed planning
Journal Article
·
· Oil and Gas Journal; (United States)
OSTI ID:5383719
- Norwegian Rig Consultants AS, Kristiansand (NO)
Environmental loads and large, heavy drilling risers impose design restrictions on drilling systems installed on deepwater tension leg platforms (TLPs). The use of a full drilling package for deepwater TLPs requires detailed planning, especially in the early conceptual phase. This paper reports that in some cases, the cost involved in full drilling operations from a deepwater TLP may be prohibitively high. For these situations, one way to make the prospect economically attractive is to predrill the wells from a floating vessel and use the TLP only as a wellhead platform. However, the use of a TLP only as a wellhead platform, with no drilling package onboard, introduces a number of disadvantages.
- OSTI ID:
- 5383719
- Journal Information:
- Oil and Gas Journal; (United States), Journal Name: Oil and Gas Journal; (United States) Vol. 90:2; ISSN OIGJA; ISSN 0030-1388
- Country of Publication:
- United States
- Language:
- English
Similar Records
Riser capability critical to TLP operations
Auger TLP well system challenges and innovations
Selecting TLP subsea wellhead requires complex process
Journal Article
·
Mon Dec 31 23:00:00 EST 1984
· Offshore; (United States)
·
OSTI ID:6078287
Auger TLP well system challenges and innovations
Conference
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:160719
Selecting TLP subsea wellhead requires complex process
Journal Article
·
Sun Dec 15 23:00:00 EST 1991
· Oil and Gas Journal; (United States)
·
OSTI ID:5506714