Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Design of TLP drilling package requires detailed planning

Journal Article · · Oil and Gas Journal; (United States)
OSTI ID:5383719
 [1]
  1. Norwegian Rig Consultants AS, Kristiansand (NO)
Environmental loads and large, heavy drilling risers impose design restrictions on drilling systems installed on deepwater tension leg platforms (TLPs). The use of a full drilling package for deepwater TLPs requires detailed planning, especially in the early conceptual phase. This paper reports that in some cases, the cost involved in full drilling operations from a deepwater TLP may be prohibitively high. For these situations, one way to make the prospect economically attractive is to predrill the wells from a floating vessel and use the TLP only as a wellhead platform. However, the use of a TLP only as a wellhead platform, with no drilling package onboard, introduces a number of disadvantages.
OSTI ID:
5383719
Journal Information:
Oil and Gas Journal; (United States), Journal Name: Oil and Gas Journal; (United States) Vol. 90:2; ISSN OIGJA; ISSN 0030-1388
Country of Publication:
United States
Language:
English

Similar Records

Riser capability critical to TLP operations
Journal Article · Mon Dec 31 23:00:00 EST 1984 · Offshore; (United States) · OSTI ID:6078287

Auger TLP well system challenges and innovations
Conference · Sat Dec 30 23:00:00 EST 1995 · OSTI ID:160719

Selecting TLP subsea wellhead requires complex process
Journal Article · Sun Dec 15 23:00:00 EST 1991 · Oil and Gas Journal; (United States) · OSTI ID:5506714