Fast-track school construction
- Brian Berg and Associates, Ltd., Schaumburg, IL (United States)
Engineers must provide the best mechanical systems that budget and construction time allow. This school construction project not only successfully balanced these concerns but also addressed indoor air quality issues. The 175,000 sq.ft. Westfield Community School in Community Unit School District 300, Kane County, Ill., was built following a fast-track schedule. Construction began in January 1994 and was completed in August 1996. The building steel and the site utilities were bid and under construction approximately two months before the mechanical, electrical, plumbing, and fire protection work. Westfield Community School houses kindergarten through eighth grade classes. It is an elementary school and middle school that share the same offices, cafeteria, library, multipurpose room, and building services. Three alternatives for the mechanical systems were examined in the initial phase of design for cost and operating characteristics. These were: a central boiler and chiller plant with variable air volume (VAV) distribution and perimeter baseboard radiation; a central boiler and chiller plant with four-pipe distribution supplying hot and chilled water to four-pipe classroom unit ventilators; and a packaged VAV rooftop HVAC unit with gas heating and electric cooling.
- OSTI ID:
- 538128
- Journal Information:
- Heating, Piping and Air Conditioning, Vol. 69, Issue 7; Other Information: PBD: Jul 1997
- Country of Publication:
- United States
- Language:
- English
Similar Records
Annual Energy Consumption Analysis Report for Richland Middle School
School picks PTI, cites programming ease, backup