Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Decontamination of concrete surfaces at the Los Alamos Scientific Laboratory

Conference ·
OSTI ID:5377777
For the past two years the Los Alamos Scientific Laboratory has been engaged in decontaminating its former plutonium facility. The facility was in use for over 30 years for plutonium operations varying from dry metallurgical processes to wet (solution) recovery processes. To date approximately 3400 square meters of floor surface have been decontaminated to permit re-use for nonplutonium work. Approximately 330 square meters of concrete surfaces required scarifying the contamination after all other attempts such as detergents and acid solutions had proven ineffective. The uses of hand-held and floor type pneumatic scarifiers are described as well as an inexpensive but effective contamination containment chamber built at Los Alamos for use with the hand-held model. Contamination control, waste handling, manpower requirements, and cost are documented for the techniques used at LASL.
Research Organization:
Los Alamos Scientific Lab., NM (USA)
DOE Contract Number:
W-7405-ENG-36
OSTI ID:
5377777
Report Number(s):
LA-UR-80-1460; CONF-800542-3
Country of Publication:
United States
Language:
English