Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Hanford Solid Waste Handling Facility strategy. [Waste Receiving and Processing (WRAP) Facility]

Technical Report ·
OSTI ID:5364214
Prior to 1970, transuranic (TRU) solid waste was disposed of at Hanford by shallow land burial. Since 1970, TRU solid waste has been stored in near surface trenches designed to facilitate retrieval after twenty-year storage period. Current strategy calls for final disposal in a geologic repository. Funding permitting, in 1983, certification of newly generated TRU waste to the Waste Isolation Pilot Plant (WIPP) criteria for geologic disposal will be initiated. Certified and uncertified waste will continue to be stored at Hanford in retrievable storage until a firm schedule for shipment to WIPP can be developed. Previously stored wastes retrieved for geologic disposal and newly generated uncertified waste will require processing to assure compliance with disposal criteria. A facility to perform this function is being developed. A study to determine the requirements of this Waste Receiving and Processing (WRAP) Facility is currently being conducted. The processes, equipment and schedules are described. Processes for use include the following: TRU/non-TRU separation; plasma torch-size reduction; arc saw-size reduction; incineration of organic solid waste; microwave plasma incineration-liquid waste; vacuum furnace metal melting; vibratory finishing-decontamination; electropolishing-decontamination. Detailed design of the WRAP Facility is slated for completion in FY 1987 with construction to be completed in FY 1991.
Research Organization:
Rockwell International Corp., Richland, WA (USA). Rockwell Hanford Operations
DOE Contract Number:
AC06-77RL01030
OSTI ID:
5364214
Report Number(s):
RHO-WM-SA-4; ON: DE82017163
Country of Publication:
United States
Language:
English