Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Synthesis Gas Demonstration Plant Program, Phase I. Commercial plant conceptual design and evaluation

Technical Report ·
DOI:https://doi.org/10.2172/5359226· OSTI ID:5359226
This volume contains the trade-off study optimizing operating pressure (1200 psig was chosen), gas purification alternatives (Rectisol and Selexol processes were chosen). Coal preparation (wet grinding in a rod mill with trommel screen removal of oversize was recommended), air quality control (a 99.65% efficiency electrostatic precipitator and Wellman-Lord sulfur dioxide removal process were recommended), and for cooling tower optimization, a cooled water temperature of 83/sup 0/F was the optimum economic choice, with a hot water entering temperature of 118/sup 0/F. (LTN)
Research Organization:
Grace (W.R.) and Co., Memphis, TN (USA); Ebasco Services, Inc., New York (USA)
OSTI ID:
5359226
Report Number(s):
DOE/ET/13402-T21(Vol.4A)
Country of Publication:
United States
Language:
English