Brief reconnaissance study for the addition of hydropower for Hills Mill Dam, Walnut Grove, Tennessee
Technical Report
·
OSTI ID:5358736
The feasibility of retrofitting the Hills Mill Dam near Walnut Grove, Tennessee for power generation was examined. This dam has a developable head of 12 ft., was built in 1930 to provide hydropower for a mill, and is not presently being used. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site is not economically feasible for normal commercial development unless an inexpensive turbogenerator system could be installed. (LCL)
- Research Organization:
- Gebhard (Thomas G.), Austin, TX (USA)
- DOE Contract Number:
- AC44-80R420006
- OSTI ID:
- 5358736
- Report Number(s):
- DOE/R4/20006-T4; ON: DE82017746
- Country of Publication:
- United States
- Language:
- English
Similar Records
Brief reconnaissance study for the addition of hydropower for Millersville Dam, Millersville, North Carolina
Brief reconnaissance study for the addition of hydropower for Degaris Mill Dam, Georgetown, Kentucky
Brief reconnaissance study for the addition of hydropower for Ledbetter Pond Dam, Ledbetter, North Carolina
Technical Report
·
Wed Jul 14 00:00:00 EDT 1982
·
OSTI ID:7151641
Brief reconnaissance study for the addition of hydropower for Degaris Mill Dam, Georgetown, Kentucky
Technical Report
·
Mon May 24 00:00:00 EDT 1982
·
OSTI ID:5290271
Brief reconnaissance study for the addition of hydropower for Ledbetter Pond Dam, Ledbetter, North Carolina
Technical Report
·
Sun Feb 07 23:00:00 EST 1982
·
OSTI ID:5358703
Related Subjects
13 HYDRO ENERGY
130100 -- Hydro Energy-- Resources & Availability
130500* -- Hydro Energy-- Economic
Industrial
& Business Aspects
DAMS
ECONOMICS
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
FEDERAL REGION IV
HYDROELECTRIC POWER PLANTS
INSTITUTIONAL FACTORS
LOW-HEAD HYDROELECTRIC POWER PLANTS
NORTH AMERICA
POWER PLANTS
POWER POTENTIAL
RETROFITTING
SAFETY
TENNESSEE
USA
130100 -- Hydro Energy-- Resources & Availability
130500* -- Hydro Energy-- Economic
Industrial
& Business Aspects
DAMS
ECONOMICS
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
FEDERAL REGION IV
HYDROELECTRIC POWER PLANTS
INSTITUTIONAL FACTORS
LOW-HEAD HYDROELECTRIC POWER PLANTS
NORTH AMERICA
POWER PLANTS
POWER POTENTIAL
RETROFITTING
SAFETY
TENNESSEE
USA