Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Brief reconnaissance study for the addition of hydropower for Hills Mill Dam, Walnut Grove, Tennessee

Technical Report ·
OSTI ID:5358736
The feasibility of retrofitting the Hills Mill Dam near Walnut Grove, Tennessee for power generation was examined. This dam has a developable head of 12 ft., was built in 1930 to provide hydropower for a mill, and is not presently being used. The study of environmental, institutional, safety and economic factors showed that hydroelectric power development at this site is not economically feasible for normal commercial development unless an inexpensive turbogenerator system could be installed. (LCL)
Research Organization:
Gebhard (Thomas G.), Austin, TX (USA)
DOE Contract Number:
AC44-80R420006
OSTI ID:
5358736
Report Number(s):
DOE/R4/20006-T4; ON: DE82017746
Country of Publication:
United States
Language:
English