Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Preoperational ALARA walk-down at the Shearon Harris Nuclear Power Plant

Journal Article · · Radiation Protection Management; (United States)
OSTI ID:5346923
 [1]
  1. Carolina Power and Light Co., Harris Energy and Environmental Center, New Hill, NC (US)
Carolina Power and Light Company's Shearon Harris Nuclear Power Plant will enter commercial operation in 19987. During its design and construction a number of reviews were performed to ensure that personnel exposures in the completed plant would be ALARA. The final review in this process consisted of a comprehensive walk-down of plant radiation controlled areas by health physics, operations, maintenance, and engineering personnel. The walk-down project was conducted over a 12-month period using detailed criteria and checklists. This article describes the project, presents examples of the criteria that were used, and list the problems that were identified for resolution as well as the good ALARA design features that were incorporated into the plant.
OSTI ID:
5346923
Journal Information:
Radiation Protection Management; (United States), Journal Name: Radiation Protection Management; (United States) Vol. 4:3; ISSN 0740-0640; ISSN RPMAE
Country of Publication:
United States
Language:
English