Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Pipeline gas from coal-hydrogenation (IGT hydrogasification process). Project 9000 monthly status report, October 1--October 31, 1977

Technical Report ·
DOI:https://doi.org/10.2172/5330312· OSTI ID:5330312
After a post-run inspection for Test 65, Test 66 was conducted with over 9 days of reactor operation with hydrogen and char feed. Steady-state, self-sustained operations were achieved at a char feed rate of about 2 tons/hr and at coal conversions ranging from 78% to 85%. A large amount of data was supplied to Procon, Inc., to aid in its design of a commercial/demonstration HYGAS plant. Results of Argonne National Laboratory's cyclone inspection are given. Methods for calculating coal and carbon conversions in the HYGAS reactor are also presented.
Research Organization:
Institute of Gas Technology, Chicago, IL (USA)
OSTI ID:
5330312
Report Number(s):
FE-2434-21
Country of Publication:
United States
Language:
English