Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Conceptual design of a spent LWR fuel recycle complex

Conference ·
OSTI ID:5324535
Purpose was to design a licensable facility, to make cost-benefit analyses of alternatives, and to aid in developing licensing criteria. The Savannah River Plant was taken to be the site for the recycle complex. The spent LWR fuel will be processed through the plant at the rate of 3000 metric tons of heavy metal per year. The following aspects of the complex are discussed: operation, maintenance, co-conversion (Coprecal), waste disposal, off-gas treatment, ventilation, safeguards, accounting, equipment and fuel fabrication. Differences between the co-processing case and the separated streams case are discussed. 44 figures. (DLC)
Research Organization:
Du Pont de Nemours (E.I.) and Co., Wilmington, DE (USA). Engineering Dept.
DOE Contract Number:
AC09-76SR00001
OSTI ID:
5324535
Report Number(s):
DP-MS-80-22; CONF-800901-4
Country of Publication:
United States
Language:
English