10 MWe Solar Thermal Central Receiver Pilot Plant. Solar facilities design integration. Construction package No. 9 (RADL Item 7-33). Piping and mechanical equipment installation

Technical Report ·
OSTI ID:5289942

Installed, tested and operable mechanical equipment, piping and accessories are presented for the Barstow Solar Pilot Plant. The work also includes furnishing and installing HVAC equipment and miscellaneous steel work; performing miscellaneous earthquake; and performance testing of the installed piping and mechanical equipment.

Research Organization:
Stearns-Roger Engineering Corp., Denver, CO (USA)
DOE Contract Number:
AC03-79SF10499
OSTI ID:
5289942
Report Number(s):
DOE/SF/10499-T83S1; STMPO-158; SAN-0499-39; MDC-G-8177; ON: DE86000654