Nuclear powered tanker. maritime design study for 600,000 DWT nuclear tanker. Volume 2. Preliminary design. Final report
Technical Report
·
OSTI ID:5287344
The study extended over a period of approximately six months. The principal objectives of the study were to develop the preliminary design for a 600,000 DWT nuclear powered ULCC, perform ship safety analyses, develop a preliminary quality assurance program, develop a ship construction schedule of key events, develop the shipyard/reactor manufacturer scope of supply, define the interfaces specifically related to the nuclear propulsion plant.
- Research Organization:
- Newport News Shipbuilding and Dry Dock Co., Va. (USA)
- OSTI ID:
- 5287344
- Report Number(s):
- PB-269724
- Country of Publication:
- United States
- Language:
- English
Similar Records
Nuclear powered tanker. Maritime design study for 600,000 DWT nuclear tanker. Volume 4. Engineering and production support. Final report
Nuclear powered tanker. Maritime design study for 600,000 DWT nuclear tanker. Volume 5. Economic evaluation. Final report
Nuclear powered tanker. Maritime design study for 600,000 DWT nuclear tanker. Volume 1. Preliminary specifications (Mod 1). Final report
Technical Report
·
Sun Nov 30 23:00:00 EST 1975
·
OSTI ID:5197946
Nuclear powered tanker. Maritime design study for 600,000 DWT nuclear tanker. Volume 5. Economic evaluation. Final report
Technical Report
·
Sun Aug 01 00:00:00 EDT 1976
·
OSTI ID:5287335
Nuclear powered tanker. Maritime design study for 600,000 DWT nuclear tanker. Volume 1. Preliminary specifications (Mod 1). Final report
Technical Report
·
Sun Nov 30 23:00:00 EST 1975
·
OSTI ID:5167505