Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Nuclear powered tanker. Maritime design study for 600,000 DWT nuclear tanker. Volume 4. Engineering and production support. Final report

Technical Report ·
OSTI ID:5197946
The study extended over a period of approximately six months. The principal objectives of the study were to develop the preliminary design for a 600,000 DWT nuclear power ULCC, perform ship safety analyses, develop a preliminary quality assurance program, develop a ship construction schedule of key events, develop the shipyard/reactor manufacturer scope of supply, define the interfaces specifically related to the nuclear propulsion plant.
Research Organization:
Newport News Shipbuilding and Dry Dock Co., Va. (USA)
OSTI ID:
5197946
Report Number(s):
PB-269726
Country of Publication:
United States
Language:
English